Contact Us

We are here to connect and collaborate on amazing projects, crafting a legacy of excellence for the future.

OFFICE ADDRESS

MUMBAI (HEAD OFFICE)
Address: 401, Acme Plaza, Opp. Sangam Cinema, Andheri-Kurla Road, Andheri (East), Mumbai – 400 059
Email: projects@listenlights.com
BENGALURU
Address: 1st Floor, BHIVE Workspace Premium, Shree Krishna Temple Road, CMH Road, Indiranagar, Bengaluru – 560 038
Email: blr.projecs@listenlights.com
CHENNAI
Address: Awfis Space Solution, 1st Floor, AWFIS Building, Rajiv Gandhi Salai, Kandanchavadi, Chennai – 600 096.
Email: chennai.projects@listenlights.com
HYDERABAD
Address: Awfis Space Solutions, 3rd Floor, Srestha Marvel, Gachibowli, Hyderabad – 500 032.
Email: hyd.projects@listenlights.com
NCR
Address: Augusta Point, Golf Course Rd, Parsvnath Exotica, DLF Phase 5, Sector 53, Gurugram, Haryana – 122002
PUNE
Address: AWFIS, Sterling Tower – B Wing, 1st floor, Pan Card Club Road, Baner, Pune, Maharashtra – 411045.
Email: pune.projects@listenlights.com

Project Brief
As the demand for on-demand cloud computing platforms surged, the biggest e-commerce giant launched multiple phases in a single building. Listenlights, as MEP-GC, successfully executed the MEP works for Phases 2, 3, 4, and 5. Impressed by our performance, delivery quality, commitment, and culture, the customer chose us for Phase 6 of 10 MW without retendering. We completed the entire MEP work within the specified timelines, solidifying our position as a trusted partner in their expansion journey."

Location - Mumbai
Final Area (Sq Ft.) - 10 MW

Project Brief
Yotta Infrastructure expanded its operations with a flagship project, launching a new Datacenter facility in NCR with a capacity of 15MW. The project comprised a DC building with 5 floors and a DG building with 3 floors. Listenlights successfully executed both the electrical High side and low side works, ensuring seamless integration and operation of the infrastructure.

Location - NCR
Final Area (Sq Ft.) - 15 MW

Project Brief
"NTT Ltd, the industry leader in IT infrastructure and services, expanded its operations in the west with a new Mumbai Datacenter. With a capacity of 4MW spread across three floors, including two DC halls and an office floor, this cutting-edge facility demanded impeccable electrical work. Listenlights successfully executed the project, encompassing HT and LT electrical installations, transformers, panels, UPS, cabling, and server racks.

Despite the challenges posed by the Covid period, including material and labor management restrictions, health and safety considerations, and working within an existing structure, our team displayed exceptional coordination and planning. We completed the project within the given timelines, showcasing our commitment to quality and timely delivery.

Impressed by our work and project delivery experience, NTT Ltd has entrusted us with their upcoming DC 5 data center phase in Mumbai. Listenlights continues to power the growth of NTT Ltd's advanced data center infrastructure.

Location - Mumbai
Final Area (Sq Ft.) - 4 MW