Our Services

DATA CENTERS
With a track record of successfully completing over 25 Data Centre projects encompassing both base build and fit-out tasks, our expertise stands unmatched. Our portfolio boasts the delivery of 300 MW of Data Centre projects across India, spanning Tier I, Tier II, and Tier III hyper-scale cloud Data Centre, Enterprise Data Centre, Colocation Data Centre facilities, and Edge Datacenter facilities.
Our team takes pride in delivering projects with a high level of attention to detail. We have a set of well-defined processes and advanced technology integration, which is complemented by our in-house design team. This allows us to ensure technical accuracy and seamless project delivery
Our clientele includes entities such as Sify, NTT, Nxtra, Yotta, PDG, NSDL, CtrlS, Emerson, and the preeminent E-Commerce Giant, a testament to our commitment to excellence in service delivery.
DATA CENTERS PROJECTS

YOTTA D1

E-COMMERCE GIANT Rabale Phase 6

E-COMMERCE GIANT Rabale Phase 5

E-COMMERCE GIANT Rabale Phase 4

Project Brief
Yotta Infrastructure expanded its operations with a flagship project, launching a new Datacenter facility in NCR with a capacity of 15MW. The project comprised a DC building with 5 floors and a DG building with 3 floors. Listenlights successfully executed both the electrical High side and low side works, ensuring seamless integration and operation of the infrastructure.

Location - NCR
Final Area (Sq Ft.) - 15 MW
Project Brief
As the demand for on-demand cloud computing platforms surged, the biggest e-commerce giant launched multiple phases in a single building. Listenlights, as MEP-GC, successfully executed the MEP works for Phases 2, 3, 4, and 5. Impressed by our performance, delivery quality, commitment, and culture, the customer chose us for Phase 6 of 10 MW without retendering. We completed the entire MEP work within the specified timelines, solidifying our position as a trusted partner in their expansion journey."
Location - Mumbai
Final Area (Sq Ft.) - 10 MW
Project Brief
To cater to escalating demand, the biggest e-commerce giant initiated multiple phases in a single building. Listenlights successfully executed MEP works as MEP-GC for Phases 2, 3, and 4, showcasing our expertise. Impressed with our performance, the customer awarded us Phase 5 of 10 MW without retendering. We delivered the complete MEP work within the specified timelines, solidifying our position as a trusted partner in their growth journey."
Location - Mumbai
Final Area (Sq Ft.) - 10 MW
Project Brief
To address the surging demand for their on-demand cloud computing platforms, the biggest e-commerce giant expanded with multiple phases in the same building. Listenlights successfully executed the MEP works as MEP-GC for Phases 2 and 3, earning their trust for Phase 4 of 10 MW. Our commitment to delivering exceptional results within the customer's specified timelines continues to fuel the growth of this renowned e-commerce giant."
Location - Mumbai
Final Area (Sq Ft.) - 10 MW

E-COMMERCE GIANT Rabale Phase 3

E-COMMERCE GIANT Rabale Phase 2

SIFY DATA CENTER Rabale T4

SIFY DATA CENTER

Project Brief
To meet the growing demand for their on-demand cloud computing platforms, the biggest e-commerce giant expanded with two phases in the same building. Listenlights successfully executed the MEP works as MEP-GC for Phase 2, leading to their selection for Phase 3 of 10 MW. We delivered the complete MEP work within the customer's specified timelines, showcasing our commitment to powering the growth of this renowned e-commerce giant."
Location - Mumbai
Final Area (Sq Ft.) - 10 MW
Project Brief
The biggest e-commerce giant expanded its operations in India with a new datacenter facility in Mumbai. With a capacity of 10MW and a single floor, Listenlights took charge as the MEP-GC and successfully executed the complete MEP work within the customer's specified timelines. Listenlights continues to empower the growth of this renowned e-commerce giant's advanced datacenter infrastructure."
Location - Mumbai
Final Area (Sq Ft.) - 10 MW
Project Brief
Sify launched a new Datacenter in Mumbai with a capacity of 20MW across G+4 floors, including 3 floors dedicated to DC Halls and 1 for the Sify corporate office. Listenlights successfully executed both the electrical High side and low side works. Our value engineering contribution included optimizing the Busduct design for smoother execution. Despite challenges posed by the old building structure, limited floor height, narrow shafts, and rainy season disruptions, we overcame these obstacles through proper coordination and planning, ensuring timely project completion.
Location - Mumbai
Final Area (Sq Ft.) - 20 MW
Project Brief
"With over 22 years of pioneering experience, Sify, India's trusted data center powerhouse, expanded its operations in South by launching a cutting-edge Datacenter in Hyderabad with a capacity of 1MW. Listenlights played a key role in executing the electrical low side works for this ambitious project. Despite facing challenges during the Covid period, including material and labor management issues, we showcased our expertise in efficient coordination and planning. Overcoming the limitations of a 7.5-ton vehicle load at the site, we ensured seamless material transfer, enabling us to complete the project within the given timelines. At Listenlights, we illuminate success by delivering outstanding results even in the most challenging environments!
Location - Bangalore
Final Area (Sq Ft.) - 1 MW

NXTRA Hinjewadi

PRINCETON DIGITAL DC

NTT DC8

NTT DC4

Project Brief
Listenlights successfully executed MEP works for Nxtra by Airtel's new Datacenter in Pune, with a capacity of 1.5MW. Despite facing the challenge of inheriting incomplete work from two previous contractors, we addressed existing issues and seamlessly resumed our operations. Our value engineering approach, exemplified by the successful relocation of earth pits without disrupting ongoing operations, contributed to the project's success within the stipulated timeline.
Location - Pune
Final Area (Sq Ft.) - 1.5 MW
Project Brief
Princeton Digital Group (PDG) expanded its operations in India by establishing a new Datacenter facility in Mumbai, with a total capacity of 24 MW. Listenlights executed the project, handling Electrical HT and LT, including installation, testing, and commissioning of transformers, LT panels, UPS systems, trunking, cabling, racks, cable trays, and PDUs. Despite challenges like working at heights of 6.5m and space constraints, we managed efficient value engineering solutions and timely completion. Our quality work led to a repeat order for the 2nd and 3rd floor Data hall within the same phase.
Location - Mumbai
Final Area (Sq Ft.) - 24 MW
Project Brief
"NTT Ltd., a leading provider of IT infrastructure and services, has established a new datacenter in Mumbai to support their expanding operations in Inida. The 8-storey facility has a 32MW capacity and includes electrical LT, UPS, trunking, cablings, racks, trays, and PDU. Listenlights carried out the project, offering colour-coded IT trunking and maintaining the required bending radius.
The Listenlights team successfully completed the NAV 1B data centre phase in Mumbai, despite facing challenges due to the customer's occupied building. Based on the calibre of the work and the skill in project delivery, the client sought repeat business for their next phase. "
Location - Mumbai
Final Area (Sq Ft.) - 32 MW
Project Brief
"NTT Ltd, the industry leader in IT infrastructure and services, expanded its operations in the west with a new Mumbai Datacenter. With a capacity of 4MW spread across three floors, including two DC halls and an office floor, this cutting-edge facility demanded impeccable electrical work. Listenlights successfully executed the project, encompassing HT and LT electrical installations, transformers, panels, UPS, cabling, and server racks.
Despite the challenges posed by the Covid period, including material and labor management restrictions, health and safety considerations, and working within an existing structure, our team displayed exceptional coordination and planning. We completed the project within the given timelines, showcasing our commitment to quality and timely delivery. Impres
sed by our work and project delivery experience, NTT Ltd has entrusted us with their upcoming DC 5 data center phase in Mumbai. Listenlights continues to power the growth of NTT Ltd's advanced data center infrastructure."
Location - Mumbai
Final Area (Sq Ft.) - 4 MW

NTT DC2

NTT DC5

NSDL

Project Brief
"NTT Ltd, a leading IT infrastructure and services company, trusted Listenlights to execute the electrical fit-out of their state-of-the-art Datacenter in Bangalore. With a massive capacity of 10MW spread across four floors, the project encompassed a range of electrical works, including transformer installation, LT panels, UPS, trunking, cabling, racks, cable trays, and PDUs.
Despite logistics and material arrangement challenges due to non-local vendors, Listenlights demonstrated unwavering commitment and successfully completed the project within the stipulated timelines. Our value engineering expertise further enhanced the existing earthing, panel, and cable tray work.
Impressed by our work quality and delivery, NTT Ltd has awarded us the opportunity to contribute to their upcoming DC 3 data center phase in Mumbai. Listenlights continues to empower industrial giants with our reliable and efficient electrical solutions.
Location - Bangalore
Final Area (Sq Ft.) - 10 MW
Project Brief
"Listenlights, a prominent MEP service provider in India, headquartered in Mumbai, proudly showcases its exceptional project achievements. One such remarkable feat was the collaboration with NTT Ltd, a leading IT infrastructure and services company. NTT Ltd aimed to expand its operations in India by establishing a new data center in Mumbai. Listenlights successfully executed the project, encompassing the installation of electrical HT and LT systems, including transformers, LT panels, UPS, trunking, cabling, racks, trays, and PDUs.
Amidst the project, Listenlights encountered significant challenges, including time constraints for material procurement, especially for the high quantity of cable trays required. Additionally, the team faced space limitations and the absence of a service lift, making internal material shifting a complex task. However, Listenlights overcame these obstacles with utmost efficiency, adhering to the stipulated timelines. The exceptional work quality and timely project delivery prompted NTT Ltd to entrust Listenlights with their new DC 6 data center phase in Mumbai, seeking a valuable partnership once again."
Location - Mumbai
Final Area (Sq Ft.) - 8 MW
DATA CENTERS PROJECTS
Project Brief
Yotta Infrastructure expanded its operations with a flagship project, launching a new Datacenter facility in NCR with a capacity of 15MW. The project comprised a DC building with 5 floors and a DG building with 3 floors. Listenlights successfully executed both the electrical High side and low side works, ensuring seamless integration and operation of the infrastructure.

Location – NCR
Final Area (Sq Ft.) – 15 MW
Project Brief
As the demand for on-demand cloud computing platforms surged, the biggest e-commerce giant launched multiple phases in a single building. Listenlights, as MEP-GC, successfully executed the MEP works for Phases 2, 3, 4, and 5. Impressed by our performance, delivery quality, commitment, and culture, the customer chose us for Phase 6 of 10 MW without retendering. We completed the entire MEP work within the specified timelines, solidifying our position as a trusted partner in their expansion journey.”
Location – Mumbai
Final Area (Sq Ft.) – 10 MW
Project Brief
To cater to escalating demand, the biggest e-commerce giant initiated multiple phases in a single building. Listenlights successfully executed MEP works as MEP-GC for Phases 2, 3, and 4, showcasing our expertise. Impressed with our performance, the customer awarded us Phase 5 of 10 MW without retendering. We delivered the complete MEP work within the specified timelines, solidifying our position as a trusted partner in their growth journey.”
Location – Mumbai
Final Area (Sq Ft.) – 10 MW
Project Brief
To address the surging demand for their on-demand cloud computing platforms, the biggest e-commerce giant expanded with multiple phases in the same building. Listenlights successfully executed the MEP works as MEP-GC for Phases 2 and 3, earning their trust for Phase 4 of 10 MW. Our commitment to delivering exceptional results within the customer’s specified timelines continues to fuel the growth of this renowned e-commerce giant.”
Location – Mumbai
Final Area (Sq Ft.) – 10 MW
Project Brief
To meet the growing demand for their on-demand cloud computing platforms, the biggest e-commerce giant expanded with two phases in the same building. Listenlights successfully executed the MEP works as MEP-GC for Phase 2, leading to their selection for Phase 3 of 10 MW. We delivered the complete MEP work within the customer’s specified timelines, showcasing our commitment to powering the growth of this renowned e-commerce giant.”
Location – Mumbai
Final Area (Sq Ft.) – 10 MW
Project Brief
The biggest e-commerce giant expanded its operations in India with a new datacenter facility in Mumbai. With a capacity of 10MW and a single floor, Listenlights took charge as the MEP-GC and successfully executed the complete MEP work within the customer’s specified timelines. Listenlights continues to empower the growth of this renowned e-commerce giant’s advanced datacenter infrastructure.”
Location – Mumbai
Final Area (Sq Ft.) – 10 MW
Project Brief
Sify launched a new Datacenter in Mumbai with a capacity of 20MW across G+4 floors, including 3 floors dedicated to DC Halls and 1 for the Sify corporate office. Listenlights successfully executed both the electrical High side and low side works. Our value engineering contribution included optimizing the Busduct design for smoother execution. Despite challenges posed by the old building structure, limited floor height, narrow shafts, and rainy season disruptions, we overcame these obstacles through proper coordination and planning, ensuring timely project completion.
Location – Mumbai
Final Area (Sq Ft.) – 20 MW
Project Brief
“With over 22 years of pioneering experience, Sify, India’s trusted data center powerhouse, expanded its operations in South by launching a cutting-edge Datacenter in Hyderabad with a capacity of 1MW. Listenlights played a key role in executing the electrical low side works for this ambitious project. Despite facing challenges during the Covid period, including material and labor management issues, we showcased our expertise in efficient coordination and planning. Overcoming the limitations of a 7.5-ton vehicle load at the site, we ensured seamless material transfer, enabling us to complete the project within the given timelines. At Listenlights, we illuminate success by delivering outstanding results even in the most challenging environments!
Location – Bangalore
Final Area (Sq Ft.) – 1 MW
Project Brief
Listenlights successfully executed MEP works for Nxtra by Airtel’s new Datacenter in Pune, with a capacity of 1.5MW. Despite facing the challenge of inheriting incomplete work from two previous contractors, we addressed existing issues and seamlessly resumed our operations. Our value engineering approach, exemplified by the successful relocation of earth pits without disrupting ongoing operations, contributed to the project’s success within the stipulated timeline.
Location – Pune
Final Area (Sq Ft.) – 1.5 MW
Project Brief
Princeton Digital Group (PDG) expanded its operations in India by establishing a new Datacenter facility in Mumbai, with a total capacity of 24 MW. Listenlights executed the project, handling Electrical HT and LT, including installation, testing, and commissioning of transformers, LT panels, UPS systems, trunking, cabling, racks, cable trays, and PDUs. Despite challenges like working at heights of 6.5m and space constraints, we managed efficient value engineering solutions and timely completion. Our quality work led to a repeat order for the 2nd and 3rd floor Data hall within the same phase.
Location – Mumbai
Final Area (Sq Ft.) – 24 MW
Project Brief
“NTT Ltd., a leading provider of IT infrastructure and services, has established a new datacenter in Mumbai to support their expanding operations in Inida. The 8-storey facility has a 32MW capacity and includes electrical LT, UPS, trunking, cablings, racks, trays, and PDU. Listenlights carried out the project, offering colour-coded IT trunking and maintaining the required bending radius.
The Listenlights team successfully completed the NAV 1B data centre phase in Mumbai, despite facing challenges due to the customer’s occupied building. Based on the calibre of the work and the skill in project delivery, the client sought repeat business for their next phase. ”
Location – Mumbai
Final Area (Sq Ft.) – 32 MW
Project Brief
“NTT Ltd, the industry leader in IT infrastructure and services, expanded its operations in the west with a new Mumbai Datacenter. With a capacity of 4MW spread across three floors, including two DC halls and an office floor, this cutting-edge facility demanded impeccable electrical work. Listenlights successfully executed the project, encompassing HT and LT electrical installations, transformers, panels, UPS, cabling, and server racks.
Despite the challenges posed by the Covid period, including material and labor management restrictions, health and safety considerations, and working within an existing structure, our team displayed exceptional coordination and planning. We completed the project within the given timelines, showcasing our commitment to quality and timely delivery. Impres
sed by our work and project delivery experience, NTT Ltd has entrusted us with their upcoming DC 5 data center phase in Mumbai. Listenlights continues to power the growth of NTT Ltd’s advanced data center infrastructure.”
Location – Mumbai
Final Area (Sq Ft.) – 4 MW
Project Brief
“NTT Ltd, a leading IT infrastructure and services company, trusted Listenlights to execute the electrical fit-out of their state-of-the-art Datacenter in Bangalore. With a massive capacity of 10MW spread across four floors, the project encompassed a range of electrical works, including transformer installation, LT panels, UPS, trunking, cabling, racks, cable trays, and PDUs.
Despite logistics and material arrangement challenges due to non-local vendors, Listenlights demonstrated unwavering commitment and successfully completed the project within the stipulated timelines. Our value engineering expertise further enhanced the existing earthing, panel, and cable tray work.
Impressed by our work quality and delivery, NTT Ltd has awarded us the opportunity to contribute to their upcoming DC 3 data center phase in Mumbai. Listenlights continues to empower industrial giants with our reliable and efficient electrical solutions.
Location – Bangalore
Final Area (Sq Ft.) – 10 MW
Project Brief
“Listenlights, a prominent MEP service provider in India, headquartered in Mumbai, proudly showcases its exceptional project achievements. One such remarkable feat was the collaboration with NTT Ltd, a leading IT infrastructure and services company. NTT Ltd aimed to expand its operations in India by establishing a new data center in Mumbai. Listenlights successfully executed the project, encompassing the installation of electrical HT and LT systems, including transformers, LT panels, UPS, trunking, cabling, racks, trays, and PDUs.
Amidst the project, Listenlights encountered significant challenges, including time constraints for material procurement, especially for the high quantity of cable trays required. Additionally, the team faced space limitations and the absence of a service lift, making internal material shifting a complex task. However, Listenlights overcame these obstacles with utmost efficiency, adhering to the stipulated timelines. The exceptional work quality and timely project delivery prompted NTT Ltd to entrust Listenlights with their new DC 6 data center phase in Mumbai, seeking a valuable partnership once again.”
Location – Mumbai
Final Area (Sq Ft.) – 8 MW

Project Brief
As the demand for on-demand cloud computing platforms surged, the biggest e-commerce giant launched multiple phases in a single building. Listenlights, as MEP-GC, successfully executed the MEP works for Phases 2, 3, 4, and 5. Impressed by our performance, delivery quality, commitment, and culture, the customer chose us for Phase 6 of 10 MW without retendering. We completed the entire MEP work within the specified timelines, solidifying our position as a trusted partner in their expansion journey."

Location - Mumbai
Final Area (Sq Ft.) - 10 MW

Project Brief
Yotta Infrastructure expanded its operations with a flagship project, launching a new Datacenter facility in NCR with a capacity of 15MW. The project comprised a DC building with 5 floors and a DG building with 3 floors. Listenlights successfully executed both the electrical High side and low side works, ensuring seamless integration and operation of the infrastructure.

Location - NCR
Final Area (Sq Ft.) - 15 MW

Project Brief
"NTT Ltd, the industry leader in IT infrastructure and services, expanded its operations in the west with a new Mumbai Datacenter. With a capacity of 4MW spread across three floors, including two DC halls and an office floor, this cutting-edge facility demanded impeccable electrical work. Listenlights successfully executed the project, encompassing HT and LT electrical installations, transformers, panels, UPS, cabling, and server racks.

Despite the challenges posed by the Covid period, including material and labor management restrictions, health and safety considerations, and working within an existing structure, our team displayed exceptional coordination and planning. We completed the project within the given timelines, showcasing our commitment to quality and timely delivery.

Impressed by our work and project delivery experience, NTT Ltd has entrusted us with their upcoming DC 5 data center phase in Mumbai. Listenlights continues to power the growth of NTT Ltd's advanced data center infrastructure.

Location - Mumbai
Final Area (Sq Ft.) - 4 MW